Mud System - Chevron Project, Iraq Kurdistan 45 Cu Ft. Sile / Hopper Piping/Jet Shear Skid

EXECUTION TIME
8 Weeks
PROJECT
Mud System – Chevron Project, Iraq Kurdistan 45 Cu Ft. Sile / Hopper Piping/Jet Shear Skid
CLIENT
PETROCHEM/CHEVRONT
SCOPE
Engineering Drawings, Material, Procurement, Fabrication, Testing, And Painting.
Total Weight: 60 Tons